On March 2, at a workshop in the Great Wall Motors (GWM) Xushui production base, the workers were busy assembling the cars in an orderly manner. Since the production was resumed on February 18, the company has formulated guiding principles of "prevention first, tiered control and management and fast response" in light of the epidemic control requirements, and taken such measures as registration, temperature monitoring, disinfection, separation and single-shift working mode, to resume operation in an orderly manner and work towards this year’s target. (Correspondent and photographer: Wu Zhanping)
On March 2, a busy and orderly working scene at the GWM Xushui production base
欢迎您使用本网站互动功能!本网站互动用户已实现与河北政务服务网统一登录,如上图所示,新用户请点击[注册]打开河北政务服务网完成注册。如果您已完成注册,请点击[登录],从河北政务服务网登录后可自动返回到本网站互动版块,然后您就可以写信提交了。